Site Preparation and Utility Work
Groundbreaking Event
Constructing the Grade Separation: s
UP Railroad Switchover on September 22, 2008
New Washington Bridge and Ribbon Cutting Ceremony
New Paseo Padre Parkway Underpass and Ribbon Cutting Ceremony, Nov 2009
Photo simulations and Renderings
Final images of new Overpass and Underpass
Demolition Activities on Washington Boulevard
Drainage Pipe Installation at Washington Boulevard
Drainage Pipe Installation at Paseo Padre Parkway
Paseo Padre Parkway
Installing the pedestrian/utility bridge over the new Paseo Padre Parkway
Crews install new Union Pacific Railroad track
Constructing the Union Pacific Railroad bridges over the Hetch Hetchy waterlines and Paseo Padre Parkway
Installing the pump well system underneath the new Paseo Padre Parkway to pump excess water into the storm drain channel
Constructing the Washington bridge deck
Constructing bridge columns and abutment walls for the Washington Boulevard Overpass