Site Preparation and Utility Work
Groundbreaking Event
Constructing the Grade Separation:
s
UP Railroad Switchover on September 22, 2008
New Washington Bridge and Ribbon Cutting Ceremony
Site Preparation and Utility Work
|
|

Demolition Activities on Washington Boulevard

Drainage Pipe Installation at Washington Boulevard |
 |

Demolition Activities on Washington Boulevard

Drainage Pipe Installation at Paseo Padre Parkway |
|

Alameda County Water District (ACWD) Water Line Relocation |
|
|
Groundbreaking Event
|
|
 |
 |
 |
|

|

|
|

|

|
|
| |
|
|
| Constructing the Grade Separation |
|
Paseo Padre Parkway |
|

Initial Grading for the Grade Separation Project
|

|

Installing the pedestrian/utility bridge over the new Paseo Padre Parkway
|
|

Crews install new Union Pacific Railroad track
|

Constructing the Union Pacific Railroad bridges over the Hetch Hetchy waterlines and Paseo Padre Parkway
|
|

Installing the pump well system underneath the new Paseo Padre Parkway to pump excess water into the storm drain channel
|

Excavating the depressed portion of Paseo Padre Parkway – east of the active railroad tracks |
|

Constructing soil/cement barrier walls for the depressed portion of the Paseo Padre Parkway
|
Constructing the new BART bridge over Paseo Padre Parkway
|
|
| Washington Boulevard |
|
|
|
|
|

Constructing the Washington bridge deck
|
|

Constructing bridge columns and abutment walls for the Washington Boulevard Overpass
|
|

Construction of the wall panels supporting the new elevated Osgood Road |
|

Constructing the new Washington Boulevard Overpass over the Union Pacific Railroad and future BART to Warm Springs extension
|
|
|
UP Railroad Switchover on September 22, 2008
|
|
|

First Union Pacific train on new corridor crossing the Driscoll Avenue and Washington Boulevard intersection at 4:30pm on September 22, 2008
|
|

First Union Pacific train on new corridor crossing the Paseo Padre Parkway intersection at 4:30pm on September 22, 2008 |
|
|

View of Union Pacific train travelling the new corridor taken from the old Union Pacific Corridor
|
|
View of UP train crossing new utility bridge over Paseo Padre Parkway |
|
|
Closer view of UP train crossing new utility bridge over Paseo Padre Parkway |
|
|
|
|
New Washington Bridge and Ribbon Cutting Ceremony |
|
|

Aerial view of the Washington Boulevard construction area one month prior to opening the new bridge and Osgood Road
|
|

Close-up aerial of the new Washington bridge one month prior to opening
|
|
|

The new Washington Boulevard Bridge one month prior to opening
|
|

The new Washington Boulevard Bridge one month prior to opening
|
|
|

The new bridge a few days prior to opening
|
|

The new bridge a few days prior to opening
|
|
|

The new bridge a few days prior to opening
|
|

Close up of the new signature light post on the bridge
|
|
|

Elected Officials first drive on bridge in City’s Hybrid vehicles
|
|

Contractor team at opening ceremony
|
|
|
|
|
|
|
|

Elected Officials drive toward ribbon to commemorate bridge opening
|
|

Celebration cake with picture of new Washington Bridge
|
|
|

First motorist to drive on new bridge on April 4, 2009
|
|

Train approaching new bridge and the soon to be removed railroad crossing for the old Washington detour road
|
|